Self-produced 3D LEADER FILM
Flying Trike: Weather and Pre-Flight Decision
Own 3D learning film with German speaker text, subtitles and full transcript: Trike flying: weather and pre-flight decision.
Own 3D animation · English text · Subtitles · 92 seconds
- 00:00 · Building weather image
- 00:21 · Wind and terrain
- 00:43 · Pre-flight inspection
- 01:06 · A good decision
Download MP4 · Download subtitles · All trike videos
The complete transcript
Building a weather picture
Before a trike flight, you need an up-to-date weather picture for the airfield, route and return. Wind, gusts, visibility and cloudiness are assessed together. Looking at the sun is not enough. Discuss with the instructor what weather information you actually need for your planned flight.
Wind and land
Terrain and obstacles change the airflow. Behind rows of trees or buildings, swirls can occur. The airlines shown here are a schematic explanation and not a weather forecast. Stick to the operational limits of the pattern and the limits your flight school sets with you.
Pre-flight inspection
Before boarding, the trike is checked according to the associated checklist. This includes wing, suspension, control and chassis. In the open cockpit loose objects must be secured. The area of the propeller remains free. The specific order is given in the AFM of the training device.
A good decision
A reasonable flight decision also takes into account experience, daily form, fuel and alternative options. Even after the start, the situation will be re-evaluated. If the conditions do not fit, a later date is the right choice. This animation helps in understanding; the briefing and the flight manual are mandatory.
Sources and additional information
Research: October 2026. Have the minimum requirements, fees and availability confirmed directly before the start of the training.